EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
dfisher
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (72)
Research
Workshop
- (7)
-
Finished build table
-
Another build table
-
Found this
-
Building side workbench
-
More hangar setup
-
Hangar!
-
Things I Realize at...
Empennage
Fuselage
- (9)
-
Plying the side
-
Gluing in trusses...
-
Gluing up scarfs...
-
Fitting up truss pieces
-
More scarfing and...
-
Bottom longeron...
-
Finishing layout of...
-
Laying out reference...
-
Getting ready to...
Firewall
Tail Feathers
- (39)
-
Finished varnishing...
-
Rear stabilizer...
-
Making Stuff to Make...
-
Rib Jig
-
Rudder Prep &...
-
Rear Elevator
-
Rear Stabilizer Work
-
Printing rib template
-
Uh - oh!
-
Rear Stabilizer...
-
Rear Stabilizer...
-
Rear Stabilizer...
-
Rear Stabilizer Work
-
Rear Stabilizer Work
-
Gluing up Elevator...
-
Gluing up Elevator...
-
Back to the Elevator
-
Cutting Cross Pieces...
-
Laying out the...
-
Building...
-
Building...
-
Building...
-
Removed staples and...
-
Cut and epoxyed...
-
Cutting gussets for...
-
Cutting gussets for...
-
Glued up gussets on...
-
Glued up a cross piece
-
Pulling Staples
-
Pulling Staples
-
Not much today....
-
More Gussets
-
Gluing up Rudder
-
Tool for taper to...
-
More gussets on the...
-
Rework of Vertical...
-
Jig for trailing edge
-
Redo of rudder
-
Redo of rudder
Wings
- (17)
-
Aileron nose ribs
-
Special ribs
-
Finishing nose ribs
-
More nose ribs
-
Ribs complete!
-
Almost to the end of...
-
Ribs
-
More ribs &...
-
Ribs and unexpected...
-
Ribs and more ribs
-
Wing Ribs continue...
-
More ribs...
-
First Rib
-
First Rib
-
First Rib
-
Wing Ribs
-
Wing Ribs
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
David Fisher
-
Project:
Team Mini-Max - Other
-
VIEW REPORTS
Total Hours:
252.3
Total Flight Time:
Total Expense:
$1238.85
Start/Last Date:
Dec 08, 2019 - Dec 08, 2019
Friendly URL:
https://eaabuilderslog.org?s=dfisher
Home or Last Project Picture
Dec 15, 2020
More scarfing and crosspieces
- (3.5 hours)
Category: Fuselage
After more head scratching figured out right scarf joint on the right hand side of bottom longeron piece. Dry fitted the two scarf joints together and held with clamps while I cut cross pieces.
IMG_20201215_185838628.jpg
IMG_20201215_185842115.jpg
IMG_20201215_185900851.jpg
IMG_20201215_185924535.jpg
IMG_20201215_185934784.jpg
IMG_20201215_185940638.jpg
IMG_20201215_185942759.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.